EV charger installation in Masterton and the Wairarapa
Pick a charger, send photos of your switchboard and where you park, and get one fixed price for the charger, the install and the Certificate of Compliance. A registered electrician from our Wairarapa installer does the wiring.
Waitlist: installer being contracted
Last checked 15 September 2026
What's different about installing an EV charger in Masterton and the Wairarapa?
Over the Remutaka Hill from Wellington, the Wairarapa is on Powerco's lines rather than Wellington Electricity's, and that is the least important thing about a Wairarapa install: a standard 7.4kW wall charger is a new circuit off your own switchboard, and the lines company is not involved. What is different is the kind of property. Masterton, Carterton and Greytown have plenty of ordinary suburban garages, where the photos settle the quote without a visit. But a good share of the jobs out here are on lifestyle blocks, vineyards around Martinborough and farm sections, where the car parks in a shed or a carport a long way from the house. The cable run from the switchboard to the parking spot is the number that decides the price, and past the standard length it is priced per metre, with trenching if it goes underground. Some rural blocks already have a three-phase supply for a pump or a workshop, which makes a faster charger an option; most houses in town are single-phase, which is all a 7.4kW charger needs. Photograph the switchboard, the whole route and where the car parks, and all of it goes in one fixed price before you pay.
Which areas of Wairarapa do we cover?
These six, and anywhere close to them: Masterton · Lansdowne · Carterton · Greytown · Featherston · Martinborough. If you're just outside that list, send the form anyway and say where you are. Quotes are free everywhere in New Zealand, and your local lines company is Powerco.
What does a standard install cover?
The same six things in Wairarapa as everywhere else, on every package and in every quote: The charger · Mounting · A dedicated circuit · The cable run · Testing and commissioning · The Certificate of Compliance.
- The charger: Supplied new, with the maker's residential warranty in your name.
- Mounting: Fixed to a suitable wall in the spot agreed from your photos: timber-framed, weathertight, ground floor.
- A dedicated circuit: Its own circuit and protection device in your existing switchboard, sized for the charger.
- The cable run: Surface-mounted cable from the switchboard to the charger, up to the length set in your quote.
- Testing and commissioning: The electrician tests the installation and sets the charger up on your phone.
- The Certificate of Compliance: Issued by the registered electrician who did the work, and emailed to you. Your balance is only due after this.
Anything outside that is named and priced in the same quote, before you pay. Switchboard work is the common one, at $1,500 to $3,000 in New Zealand. How to tell if your board needs it.
Which charger packages can I get in Wairarapa?
The same three as everywhere else: Evnex E2 Core, installed, Evnex E2 Plus, installed, Evnex X22, three-phase, installed. The price doesn't change by region. Your switchboard, the cable run and whether you're single or three phase are what move it.
7.4 kW
Single phase · 5 m tethered cable
The straightforward one. A 7.4kW single-phase charger with a 5-metre attached cable, which suits almost every New Zealand home on a normal single-phase supply.
Fixed installed price coming soon
Typical NZ range $1,500–$2,500 · Typical NZ 7kW home install, charger and labour
7.4 kW
Single phase · 8 m tethered cable
The same 7.4kW charging as the E2 Core, with a longer 8-metre cable and both Wi-Fi and 4G, so it stays connected where the house Wi-Fi doesn't reach the garage.
Fixed installed price coming soon
Typical NZ range $1,500–$2,500 · Typical NZ 7kW home install, charger and labour
22 kW
Three phase required · Tethered Type 2
22kW on a three-phase supply. Only worth it if your home already has three phase and your car accepts more than 7kW of AC charging, which most don't.
Fixed installed price coming soon
Typical NZ range $2,500–$5,000 · Typical NZ 11–22kW install on an existing three-phase supply
Ranges from Home Charger NZ, reviewed 31 July 2026. Evnex's own direct installed prices, checked 15 September 2026, are shown on each package page.
Questions about Masterton and the Wairarapa
How much does EV charger installation cost in Masterton and the Wairarapa?
The same as everywhere else in New Zealand: $1,500 to $2,500 for a typical 7.4kW single-phase install, charger included. We don't publish regional multipliers because no source supports them. What actually moves your price is your switchboard, the cable run and whether you're single or three phase. The full cost breakdown.
Do you install EV chargers in Martinborough and Featherston?
Yes, the whole Wairarapa from Masterton down to Martinborough and Featherston is on the same price list. We're contracting the installer for the Wairarapa now, so today you can send photos and join the waitlist; nothing is charged until an installer is confirmed and you have a fixed quote.
I'm on a lifestyle block. Will a standard install cover me?
It depends on the distance from the switchboard to where you park. A standard install covers a surface-mounted run up to the length set in your quote. A charger on a shed or an implement bay across a yard is a longer run, priced per metre, and an underground run between buildings is trenching. Show us the route and it is all in one quote before you pay.
My block has three-phase power. Does that change anything?
It gives you the option of a faster charger. A 7.4kW single-phase charger suits almost every household; three-phase allows an 11 to 22kW unit if your car can take it, and most cars charge at 7.4kW or 11kW at home anyway. Tell us in the form and the quote will show both. Single-phase or three-phase explains the trade-off.
Does being on Powerco rather than Wellington Electricity matter?
Not for a home charger. The charger is wired to your switchboard on a new circuit, and the lines company is not part of the job. It only matters if your supply itself needs upgrading, which is rare for a 7.4kW install and would be flagged in the quote.
Can the charger go in a shed or outside on a farm?
Yes. Home wall chargers are rated for outdoor mounting, and a shed wall is a common spot out here. Pick a wall sheltered from the prevailing nor'wester where you can, and make sure the car can park within reach of the cable; we'll ask for a photo of the spot.
Who does the electrical work?
A registered electrician from our contracted installer for the region. They do all the electrical work, test it and issue the Certificate of Compliance in their own name. We quote the job, hold the contract with you and manage it. We are not electricians and hold no electrical registration.
When do I pay?
A $500 deposit only if you accept the price, fully refundable any time before installation starts. The balance is invoiced once the Certificate of Compliance is issued. How it works.
Send your photos. Get one price.
Five phone photos and five minutes. We check them with our installer and email one fixed price for the charger, the install and the Certificate of Compliance. Nothing is charged until you accept it.