EV charger installation in Whangārei and Northland
Pick a charger, send photos of your switchboard and where you park, and get one fixed price for the charger, the install and the Certificate of Compliance. A registered electrician from our Northland installer does the wiring.
Waitlist: installer being contracted
Last checked 15 September 2026
What's different about installing an EV charger in Whangārei and Northland?
Whangārei and the Kaipara are on Northpower's network, and the Far North, from Kerikeri up, is on Top Energy's. Northland jobs differ from city ones in two ways. The first is distance: a charger on a detached garage, a shed or a carport across a lawn is a longer cable run than a suburban garage, and sometimes trenching. The second is the coast. Salt air is hard on anything fixed outside, so on a coastal section the installer will look for a sheltered wall out of direct wind and spray. Photograph the whole route from the switchboard to the parking spot, and the side of the house you'd like it on, and both get priced in the quote rather than on the day.
Which areas of Northland do we cover?
These 11, and anywhere close to them: Whangārei · Kamo · Onerahi · Whangārei Heads · Maungatapere · Ngunguru · Tutukākā · Ruakākā · Waipu · Dargaville · Kerikeri. If you're just outside that list, send the form anyway and say where you are. Quotes are free everywhere in New Zealand, and your local lines company is Northpower (Top Energy in the Far North).
What does a standard install cover?
The same six things in Northland as everywhere else, on every package and in every quote: The charger · Mounting · A dedicated circuit · The cable run · Testing and commissioning · The Certificate of Compliance.
- The charger: Supplied new, with the maker's residential warranty in your name.
- Mounting: Fixed to a suitable wall in the spot agreed from your photos: timber-framed, weathertight, ground floor.
- A dedicated circuit: Its own circuit and protection device in your existing switchboard, sized for the charger.
- The cable run: Surface-mounted cable from the switchboard to the charger, up to the length set in your quote.
- Testing and commissioning: The electrician tests the installation and sets the charger up on your phone.
- The Certificate of Compliance: Issued by the registered electrician who did the work, and emailed to you. Your balance is only due after this.
Anything outside that is named and priced in the same quote, before you pay. Switchboard work is the common one, at $1,500 to $3,000 in New Zealand. How to tell if your board needs it.
Which charger packages can I get in Northland?
The same three as everywhere else: Evnex E2 Core, installed, Evnex E2 Plus, installed, Evnex X22, three-phase, installed. The price doesn't change by region. Your switchboard, the cable run and whether you're single or three phase are what move it.
7.4 kW
Single phase · 5 m tethered cable
The straightforward one. A 7.4kW single-phase charger with a 5-metre attached cable, which suits almost every New Zealand home on a normal single-phase supply.
Fixed installed price coming soon
Typical NZ range $1,500–$2,500 · Typical NZ 7kW home install, charger and labour
7.4 kW
Single phase · 8 m tethered cable
The same 7.4kW charging as the E2 Core, with a longer 8-metre cable and both Wi-Fi and 4G, so it stays connected where the house Wi-Fi doesn't reach the garage.
Fixed installed price coming soon
Typical NZ range $1,500–$2,500 · Typical NZ 7kW home install, charger and labour
22 kW
Three phase required · Tethered Type 2
22kW on a three-phase supply. Only worth it if your home already has three phase and your car accepts more than 7kW of AC charging, which most don't.
Fixed installed price coming soon
Typical NZ range $2,500–$5,000 · Typical NZ 11–22kW install on an existing three-phase supply
Ranges from Home Charger NZ, reviewed 31 July 2026. Evnex's own direct installed prices, checked 15 September 2026, are shown on each package page.
Questions about Whangārei and Northland
How much does EV charger installation cost in Whangārei and Northland?
The same as everywhere else in New Zealand: $1,500 to $2,500 for a typical 7.4kW single-phase install, charger included. We don't publish regional multipliers because no source supports them. What actually moves your price is your switchboard, the cable run and whether you're single or three phase. The full cost breakdown.
Do you install EV chargers in Kerikeri and the Bay of Islands?
Yes, on the same price list as Whangārei. The Far North's lines company is Top Energy rather than Northpower, which changes nothing for a standard 7.4kW install on an existing single-phase supply. We're contracting the Northland installer now, so today you can send photos and join the waitlist.
I'm on a rural property. Will a standard install cover me?
It depends on the distance from the switchboard to where you park. A standard install covers a surface-mounted run up to the length set in your quote; past that it's priced per metre, and an underground run is trenching. Show us the route and it's all in one quote before you pay.
Can an EV charger go outside on a coastal property?
Yes, home wall chargers are built for outdoor mounting, but the spot matters near the sea. A wall sheltered from the prevailing wind, under an eave, does better than one facing straight onto the beach. Tell us in the form if you're close to the coast and the installer will choose the location with that in mind.
Who does the electrical work?
A registered electrician from our contracted installer for the region. They do all the electrical work, test it and issue the Certificate of Compliance in their own name. We quote the job, hold the contract with you and manage it. We are not electricians and hold no electrical registration.
When do I pay?
A $500 deposit only if you accept the price, fully refundable any time before installation starts. The balance is invoiced once the Certificate of Compliance is issued. How it works.
Send your photos. Get one price.
Five phone photos and five minutes. We check them with our installer and email one fixed price for the charger, the install and the Certificate of Compliance. Nothing is charged until you accept it.