EV charger installation in Wellington, the Hutt and Kāpiti
Pick a charger, send photos of your switchboard and where you park, and get one fixed price for the charger, the install and the Certificate of Compliance. A registered electrician from our Wellington installer does the wiring.
Waitlist: installer being contracted
Last checked 15 September 2026
How much does EV charger installation cost in Wellington, the Hutt and Kāpiti?
A typical 7kW home install in Wellington comes to $1,500 to $2,500, charger included; Wellington electricians publish ranges running up to $3,500. The top of that range is switchboard work and long cable runs, and both are more common here than in most cities: older board houses and steep, split-level sections where the parking sits well away from the switchboard.
| What you're paying for | Published price | Source |
|---|---|---|
| Basic home install, suitable wiring already in place | from about $1,200 | Weka Electrical, Wellington |
| Wellington installs, simple to complex | $1,200 – $3,500 | Weka Electrical, Wellington |
| Wellington installs, by charger, distance from board and upgrades | $1,500 – $3,500 | Silver Fern Electrical, Khandallah |
| Typical 7.4kW single-phase install, charger included (NZ) | $1,500 – $2,500 | Our NZ cost breakdown |
| Switchboard upgrade, where the board has no room or RCD | add $1,500 – $3,000 | Our NZ cost breakdown |
Figures as published by each installer, checked 31 October 2026. Neither Wellington page says whether its range includes GST. These are market prices, not our quote: ours is one fixed figure, given from your photos before you pay anything.
We price Wellington the same as the rest of New Zealand: the packages below, plus one fixed figure for your install, worked out from your photos before you pay. The full NZ cost breakdown.
What's different about installing an EV charger in Wellington, the Hutt and Kāpiti?
Wellington city, Porirua and the Hutt Valley are on the Wellington Electricity network. Two things make Wellington jobs different in practice, and both show up in your photos: a lot of the housing stock is on steep or split-level sites, so the run from the switchboard to the parking spot is often longer than the 5 metres a tethered charger's cable covers, and older Wellington and Hutt board houses often have a switchboard that predates RCD requirements. Both are priced in the quote rather than discovered on the day. The Kāpiti Coast, from Paekākāriki to Ōtaki, is on Electra's network rather than Wellington Electricity's, which changes nothing for a standard install. Over the Remutaka Hill, the Wairarapa has its own page: it is a different lines company and a more rural kind of job.
Which areas of Wellington do we cover?
These seven, and anywhere close to them: Wellington city · Lower Hutt · Upper Hutt · Porirua · Paraparaumu · Waikanae · Ōtaki. If you're just outside that list, send the form anyway and say where you are. Quotes are free everywhere in New Zealand, and your local lines company is Wellington Electricity (Electra on the Kāpiti Coast).
What does a standard install cover?
The same six things in Wellington as everywhere else, on every package and in every quote: The charger · Mounting · A dedicated circuit · The cable run · Testing and commissioning · The Certificate of Compliance.
- The charger: Supplied new, with the maker's residential warranty in your name.
- Mounting: Fixed to a suitable wall in the spot agreed from your photos: timber-framed, weathertight, ground floor.
- A dedicated circuit: Its own circuit and protection device in your existing switchboard, sized for the charger.
- The cable run: Surface-mounted cable from the switchboard to the charger, up to the length set in your quote.
- Testing and commissioning: The electrician tests the installation and sets the charger up on your phone.
- The Certificate of Compliance: Issued by the registered electrician who did the work, and emailed to you. Your balance is only due after this.
Anything outside that is named and priced in the same quote, before you pay. Switchboard work is the common one, at $1,500 to $3,000 in New Zealand. How to tell if your board needs it.
Which charger packages can I get in Wellington?
The same three as everywhere else: Evnex E2 Core, installed, Evnex E2 Plus, installed, Evnex X22, three-phase, installed. The price doesn't change by region. Your switchboard, the cable run and whether you're single or three phase are what move it.
7.4 kW
Single phase · 5 m tethered cable
The straightforward one. A 7.4kW single-phase charger with a 5-metre attached cable, which suits almost every New Zealand home on a normal single-phase supply.
Fixed installed price coming soon
Typical NZ range $1,500–$2,500 · Typical NZ 7kW home install, charger and labour
7.4 kW
Single phase · 8 m tethered cable
The same 7.4kW charging as the E2 Core, with a longer 8-metre cable and both Wi-Fi and 4G, so it stays connected where the house Wi-Fi doesn't reach the garage.
Fixed installed price coming soon
Typical NZ range $1,500–$2,500 · Typical NZ 7kW home install, charger and labour
22 kW
Three phase required · Tethered Type 2
22kW on a three-phase supply. Only worth it if your home already has three phase and your car accepts more than 7kW of AC charging, which most don't.
Fixed installed price coming soon
Typical NZ range $2,500–$5,000 · Typical NZ 11–22kW install on an existing three-phase supply
Ranges from Home Charger NZ, reviewed 31 July 2026. Evnex's own direct installed prices, checked 15 September 2026, are shown on each package page.
Questions about Wellington, the Hutt and Kāpiti
How much does EV charger installation cost in Wellington, the Hutt and Kāpiti?
Most 7kW home installs in Wellington, the Hutt and Kāpiti come to $1,500 to $2,500, charger included, which sits inside the ranges local electricians publish and matches the national figure. What moves your price is your switchboard, the cable run and whether you're single or three phase. The full cost breakdown.
Do you cover Lower Hutt and Upper Hutt?
Yes, the Hutt Valley and Porirua are in our Wellington service area, on the same price list. We're contracting our Wellington installer now, so right now you can send photos and join the waitlist.
Do you install in the Wairarapa: Masterton, Greytown, Martinborough?
Yes, on the same price list, and the Wairarapa has its own page in the regions list because it is a different network (Powerco rather than Wellington Electricity) and the jobs are more often rural. The short version: a standard 7.4kW install is the same anywhere, and what changes a Wairarapa quote is the cable run to a shed or outbuilding.
Do you install EV chargers on the Kāpiti Coast?
Yes, Paraparaumu, Waikanae, Raumati and Ōtaki are on the same Wellington price list. The Kāpiti Coast's lines company is Electra rather than Wellington Electricity, which makes no difference to a standard 7.4kW charger on an existing single-phase supply. Plenty of Kāpiti homes are single-level on flat sections with an attached garage, which is the simplest install there is: the photos usually settle it without a visit.
My parking is down a driveway, away from the house. Can that work?
Often yes, but it's the single biggest price variable in Wellington. The distance from the switchboard to the charger sets the cable length, and a run to a detached garage or a lower parking pad may need trenching. Show us the route in your photos and it gets priced in the quote.
Can a normal electrician install an EV charger in Wellington?
Yes, any registered electrician can. A wall charger on its own circuit is prescribed electrical work, so it must be done by a registered electrician and signed off with a Certificate of Compliance, but there is no separate EV licence. Charger makers like Evnex certify installers for their warranty, which is why we use certified ones.
My switchboard looks old. Is that a problem?
It's very common and not a dealbreaker. What matters is whether the board has spare capacity and RCD protection. If it doesn't, the switchboard work goes in the same quote with a price on it, rather than turning up as a surprise on install day.
Who does the electrical work?
A registered electrician from our contracted installer for the region. They do all the electrical work, test it and issue the Certificate of Compliance in their own name. We quote the job, hold the contract with you and manage it. We are not electricians and hold no electrical registration.
When do I pay?
A $500 deposit only if you accept the price, fully refundable any time before installation starts. The balance is invoiced once the Certificate of Compliance is issued. How it works.
Sources
- Wellington Electricity, the distribution network for Wellington, Porirua and the Hutt Valley
- Electra, the electricity distribution network for the Kāpiti Coast and Horowhenua
- Weka Electrical, EV charger installation Wellington: $1,200 to $3,500 (checked 31 October 2026)
- Silver Fern Electrical, EV charger installation Wellington: $1,500 to $3,500 (checked 31 October 2026)
- Electrical Workers Registration Board, Electric vehicle charging installations (18 December 2025)
- Home Charger NZ, EV charger installation cost NZ, reviewed 31 July 2026
Send your photos. Get one price.
Five phone photos and five minutes. We check them with our installer and email one fixed price for the charger, the install and the Certificate of Compliance. Nothing is charged until you accept it.